Going down – 171 metre tower felled in controlled blast.
We have just received this great video that captures the explosive felling of a 171 metre tall pre-stressed concrete tower near Namur in Belgium.
The work was carried out by Wanty and Orice with input from Ginger CEBTP Demolition for client Proximus.