Cleveland braced for Saturday bridge blast…

CDI ready to drop part of Innerbelt Bridge.

The Ohio Department of Transportation and Trumbull-Great Lakes-Ruhlin say a controlled explosive demolition of the steel skeleton of the 1959 Innerbelt Bridge will take place at first light on Saturday morning July 12.

Controlled demolition will drop five of the nine steel spans of the old bridge.

The team which includes Joseph B. Fay Company and Controlled Demolition, Inc. has used a mixture of both traditional demolition along with the “controlled” – or explosive – demolition method. The bridge railings, lights, barriers and concrete driving surface were all removed using traditional methods.

Specific spans over the river and railroads were also disassembled in a traditional manner. Concrete piers will be demolished this summer using traditional methods.

Read more here.